Sunday, July 20, 2008

comparisons


old living room


new dining room (that was the wall to the outside)




family room picture previously posted



updated shot of family room




new window (up) versus old window (down)




new brick - shot of master bed/bath area over toward the family room (with the tree we worked so hard to save!!) the unbricked areas are a product like hearty/cement board - a wood look



view of new library from inside


view of new library from outside

Thursday, July 17, 2008

wow, workers


this shot is taken from the family room looking into the kitchen and to the friends' entrance


I couldn't even count the number of guys at the house today! well, except for the 5 white guys, they stand out - hahahahaha.


The drywall is going up, the brick is going up, the replacment windows are going in, the place is a mess, but in a good way.



in this picture, the 2 new windows are on the short wall of the house and the old windows are still in downstairs (and there are no windows upstairs).

Saturday, July 12, 2008

Flurry of Activity

Apparently the project has spurts of activity and yesterday was one of those days. The new doors & windows are being installed, but the replacement windows are not in yet. Insulation began. Hvac is (hopefully) being completed (this area has been the worst - more problems, seemingly less competence). Brick was delivered. Next week should be a fun week for seeing
more progress!



from backyard - looking at screened porch and french doors in family room


new garage and new side entrance that we lovingly refer to as our "friends entrance" - so now you know which door to use when you come over. : )

Wednesday, July 2, 2008

our little world

In case we haven't shared this sentiment with you, we love our neighborhood. It's our own little world where, for the most part, things are as you'd want them. Yes, we have crime, and speeders, and litterbugs, but all of those things give us the opportunity to meet with neighbors for discussion or to teach the kids that cleaning up trash is the right thing to do. I received a phone call today from a gentleman who asked a few questions to make sure he had the right number. Well, it was Jim, our mailman. He said he had a package that wouldn't fit into the mailbox and since we didn't have a front door he wondered what we'd like for him to do with it. Now, when does that happen? Really, any other mail carrier would have left that orange note in the mailbox informing me that I'd have to go the post office and wait in the long line to get the package. And a few weeks ago, Doug, our UPS guy, signed for our package on a Friday because the road was closed for repaving and delivered it to us personally during the weekend. Nice, nice guys!!

Brent went to the house to retrieve the above mentioned package (a gift for me apparently!!) this evening and noted that our new french doors are waiting in the garage. I see more progress on the horizon.

Friday, June 27, 2008

waiting

We're just waiting for windows to arrive. They are now expected July 8. There was a delay due to an onsite change during framing (I may have posted something about that fateful day when I almost went postal on the poor window guy because the framer had 3 different sized windows out of 4 total in Savannah's room) which I had to correct. We don't seem to be as upset with this delay as the builder - go figure.

after windows and doors come I think things will pick up again for a few weeks - brick, drywall, floors, measuring for cabinets, concrete for porches. That'll be a good time for more house pictures.

Monday, June 16, 2008

Handy Man

Brent has so much of his dad in him and it's saving us a bunch of money this week! He learned all manner of handyman skills growing up and he's putting them to good use this week. Since we decided 1. that the particular company our builder uses for A/V and security must have enough work because there was no impetus to get bids together, etc. (and the lady who answers the phone is very rude) and 2. not using that same company would save us a ton of money, then Brent started his homework on what components to buy and how to lay out our video/data/phone wiring for the house. He spent Saturday afternoon and this afternoon running wires. He's almost done too!
I'm so blessed to have him!!

Tuesday, June 10, 2008

Next.

Windows are expected next week. Then the bricking can begin. The electrical rough-in is complete, as well as the plumbing. The HVAC should be finished soon. Probably would have been done by now except no one has ever installed the Vent-a-Hood Brent has selected and there are a million questions. We have fireplaces and new face boards on the whole house (those are the boards under the roof). Insulation is scheduled for the 23rd and drywall after that.

Each day there are a million annoying little questions or problems, but that's because we have very specific instructions for everything. The poor men that have to deal with us!!! I'm sure we're good talk around the water cooler.

The architect came back to town to "fix" the lighting issue in the kitchen. Some of the lights were in the way of the ceiling beams ("decorative" beams). Apparently my suggestion that ALL the subs on the job get together to discuss the impact of every other sub's job was thought to be silly. Well, case in point, the copper water lines were in the way of the light placement in one room and in the shower, the exhaust fan was in the way of the rain head. Hhuumm, maybe it would have be inconvenient, but I bet it would've saved a lot of extra work moving light fixtures, PVC pipes, ceiling joists, plugs, switches, air vents/returns, thermostats and bath fixtures. ; )