Wednesday, May 28, 2008

Guests

We officially entertained our first guests on Monday. We were at the house checking out everything (and using that neon green ribbon!) and some of our good friends came by to see the progress. At the end of the "tour," we sat on the step down into the family room and just chatted while watching the kids run around in the backyard. It was awesome! Even though there are no walls, it still felt like home.
Thanks to Doug, Raegan & the kids for coming over and helping us keep the big picture in mind.

Friday, May 23, 2008

"mistake!"

We have a new roof - at least on most of the house. On the flip side, we have no ceilings anywhere except the upstairs of the original house. The downstairs ceilings were completely ripped out in order to put in some new wiring for lights. We had a successful meeting today with the granite/marble supplier; by successful I mean that it looks like we stayed within budget and can get everything we wanted.

Our builder gave Brent a roll of neon green ribbon today and said to put it on anything that needs attention. Can you say, "Mistake!!" There are several scenarios potentially at play here. 1. he wants to cut down on the number of phone calls from us, 2. he wants to cut down on the number of emails from us, 3. he wants to see if we'll be so particular if we have to tie ribbon to everything, or maybe 4. it's a good visual in order to make fun of us with the subs on the job. Anyway, we went over today after the electrician and used a good amount of the neon ribbon. I thought I'd email the builder and tell him we need another roll! hahahahaahaha. The only real stress we're experiencing right now with this project is the stress caused by the guys doing what they do for every house instead of what we want for our house, but I think we're making progress in that regard.

Tuesday, May 20, 2008

Pluggin' along

Plumbing, HVAC and electrical are going on now. Nothing noteworthy that doesn't confirm our neuroses. In our defense, at least we know we're neurotic and don't try to play it off or blame it on others. We take full responsibility; actually embrace it!

Working out some little details on cabinetry, tile, lighting. Hopefully we'll be selecting our granite and marble slabs on Friday. We're just pluggin' along now. After all the wiring is done we'll have some pictures of the drywall going up.

Saturday, May 10, 2008

understanding the situation

Now I understand why everyone says the work slows to a crawl after framing - the "white guys" start working. The crew of Mexican men started early in the morning and worked until dark and on Saturdays (which explains why the house went up so quickly). Now that the "white guys" have started, the place is a ghost town by 4 pm. We'll see if this observation holds true throughout the remainder of this project...

Friday, May 9, 2008

plumbing began

The visible changes are minute right now except for the very large cast iron pipe running through the new hall that has been removed. Randy the plumber started Wednesday. He worked all day on getting that huge pipe out of the new hallway while keeping the upstairs baths functional. Many of you may remember the wall that separated the computer area and the 1/2 bath - well that pipe (the waste water from the two bathrooms upstairs) was running in that wall to the basement to connect to the sewer line. When the wall went away, the pipe didn't. Until yesterday. So now we have a hallway.
We made our final decision on brick on Wednesday too. Of course there's no perfect match for 60 yr weathered brick, but it's pretty close, and the mortar is called "Tennessee Buff!" We decided that a nice redwood trellis with a vine (and not a vine that will overtake the house in a matter of weeks) over the old garage and over the new garage will help minimize any discrepancy in brick/mortar color.
Monday we meet the guy at the house to work on the front door. It was drawn at 5'8" (I think) and by the time trim went in, etc., our side lights were all of about 6" wide and that does NOT look right, so we expanded the opening. Now we need another meeting in order to get things back on track. We're also meeting the concrete guy Monday to pick a color for our stained/stamped/scored porches.
Then the electrician is to begin right before Memorial Day. We are doing a walk through with a can of spray paint so there won't be any confusion about where we want outlets, jacks, etc. Well, we are still enjoying this process and if any of you remodel/renovate, we're happily at your service! Love to all.

Monday, May 5, 2008

framing days 13-15


There have been a few minor changes during framing, but nothing major-a wall moved a few inches here, a door changed there. Things are moving right along. We feel the need to get some firm decisions made so as not hold up any progress. We picked our HVAC today, are meeting with the brick guy later this week, and are finalizing our roofing materials. Some of the fun stuff should begin soon - like drywall. The plumbers are expected this week as well as the electrical guys.

Brent took a few pics the other day of our coffered ceiling in the new family room. You can also see the framing for the fireplace.

Thursday, May 1, 2008

framing days 10-12

I just can't put all the awesome pictures of the work going on in the house on this blog...so here it is in a verbal nutshell.

There is a new back staircase from the friends' entrance, the framing for the coffered ceiling in the family room has been done, the cuts have been made in the original house for transomes over the living and dining room entrances, and the fireplaces are framed in addition to all the work that is readily visible outside.

We have "joked" with our builder that we're not his run-of-the-mill job, but he didn't get that we weren't talking about the house but about us. Case in point: apparently the roof was in the way of a window upstairs. We wrung our hands over the correct placement, number and spacing of the windows during the design phase with the architect, but apparently one cannot always build a house as drawn - something about "in a perfect world..." anyway, Brent and I were touring the house a couple of nights ago and noticed the window in the master bath watercloset was just barely over the top of the potty - and it looks right into the neighbor's driveway. We talked with the window guy, who, by the way, is almost as OCD as we are!, about making that one shorter when he mentioned a change upstairs that the framer called him about last week. I ended up meeting him at the house to go over these things and low and behold I almost went postal when I saw the change that had been made. I'm sure he was, at a minimum, glad he was not the man who was married to me! anyway, after a little discussion we worked out everything before it became catastrophe #2. So, we will again be explaining to the builder that we realize this is his line of work, but we want to be notified of every tiny adjustment before it's made. That'll probably come back to bite us!

well, here's a couple of shots from framing day 12.