Monday, February 23, 2009

for "the girls"

This one is for the All Smiles girls -- here's what hubby did while I was out having fun with you in CO.
*installed new, cute foyer light
*cleaned up toys in basment
*assembled entertainment center components and got in working order in the basement
*reassembled elliptical trainer and put it in it's new home in the basement
*fixed improperly installed door
*assembled Em's new desk and hutch (think IKEA here)
*cut and installed 2 new shower rods
*assembled teak bench #2 (woohoo- that's for the steam shower!)
*moved light at top of basement stairs (builder's elec just blanked it off since it was now behind the door) so now we don't all fall down the steps trying to find the first one.
*took care of 4 semi-sick children

Sunday, February 15, 2009

laundry

ok, so we don't have columns on the side or back porches; no driveway; still have a giant stump in the front yard which has no grass - mud only (except for the lovely erosion fence all the way across the yard), but I have my wishy-washy back. I have done all the laundry piled up for the better part of 10-12 days in just under 4 hrs. I love my wishy-washy!!! I do recommend this laundry for those with a little larger than normal family. We purchased 2 washers and 2 dryers and have them set all 4 in a row under a countertop for folding. The machines are inexpensive front loaders. I don't typically wash 16 pairs of jeans at once, so those giant machines don't woo me to buy them. And since they are a bit on the small side, they fit nicely under a counter leaving me lots of space for folding. Just another reason it's good to be home.

Saturday, February 7, 2009

accomplished - weekend the second

Just in case any of you are checking the blog for our progress so you know when to schedule a visit, I don't want to disappoint. Still no "guest room" per say, but come anyway, we'll make due.

After a few runs to the hardware store and the local home improvement stores this week (yes, that's how we spent date nite again this past week), Brent had lots of things he could get complete. And the list goes:
hardware on the cubbies and cabinet installed
DW panels on and handles attached (this, of course, involved much more than sticking the panel to the front of the dw. each dw had to be adjusted for height before anything else could be done.)
towel ring, towel bar, knob and latch closer-thingie installed in Em's bath
towel ring and tp holder installed pwd rm
towel ring and towel bar installed VayVay's bath
knobs and pulls for bev cntr ordered (had to be order via ph for coupon -- that takes a lot longer than online)
knobs on pwd rm vanity installed *
elec. covers installed on cabinets in LR and dressing area for hidden plugs--we have awesome cabinetry bc the smell of burning lumber still lingers from his drilling
island pendants installed
hall lights installed
cable hooked up
enormously heavy tv (no, we haven't gone flat panel) put in bdrm armoire (and yes, this counts as an item bc that tv takes 2 men and me to get into the cabinet)
furniture moved from basement to playroom
about 5 more boxes emptied*


most of these things were done today, but a couple were during the week while he a few days off. Mostly those off days were spent shopping -- and I mean shopping, not buying, for the most part, for the items we still need.

Friday, February 6, 2009

Quote of the Day

This exchange was too funny not to share! Our fabulouso mailman, Jim, happened to be delivering a pkg (thx auntB) today as Brent was returning home. (Jim had backed his mail truck all the way down the driveway probably bc of all the ice). I noticed, as I was cleaning paint off of the hinges in the DR, that the 2 men were engaged in quite a lengthy discussion. Brent told me their conversation and it's a must share.
Jim mentioned some damage he's sustained at his house in Sept from Ike and then last week with the ice. Then he said how his contractor basically half-*ssed the job each time and how annoyed he gets with that type of attitude. He concluded with,"I almost went postal." HILARIOUS!!!!!
Anyway, this was great news to me that I am not alone in this world! I don't feel that complacency should be rewarded. Hence the struggle throughout this project. Now that we are home and doing everything ourselves, things go quicker bc they are done just once - the right way the first time. "Measure twice, cut once" comes to mind...
All of this came after a ph call this morning from a sub-contr company--the man was telling me that they are very backed up bc of said ice storm and that I could probably fix the problem by jiggling the sensor. I explained in my nicest, "I'm not as stupid as you apparently think I am" voice that I would be happy to do their work after paying for such expensive items from his company, but that the problem was not what he had indicated, bc we already know that trick. We're on the schedule for next Friday.

How do you feel about complacency in this day and age?

Monday, February 2, 2009

Snowed In

How often does one hear a mother (of 4 no less) say she was happy with a week off from school because of snow? Well, we had a very nice week last week. We had 6-8" of snow and ice. The kids played outside with the neighbors everyday. It was wonderful. We also did NOT loose power this time. As the lights flickered multiple times Monday night and Tuesday, we just hoped... because we decided to not pay the builder's exorbitant price for a natural gas generator and hire someone later. (and I heard that the house we'd rented was without power -- and we probably could not have gotten down that huge hill to get out)

We are still melting today as flurries are forecasted for tomorrow and Wednesday.



a picture of our neighbor's house taken from our front porch




icicles!!!