Wednesday, October 8, 2008
horse show
I'm behind in keeping everyone updated, so I'll start with some good stuff. We took Emma to a horse show this past weekend - it was a bigger show than she'd been involved in before. She needed the special shirt and the jacket for this show.
the day was grueling for the parents. Em had to be there at 7am for schooling (practice). I was called and told that if I arrived with the other children around 11 we would be fine. We got there at 11. Em didn't show until 3:15! We're going to have to figure out what to do with this - the babies can't handle 4hrs of not being able to move around freely.
well, she participated in 3 classes - 2 classes jumping 2ft rails and 1 class called undersaddle (judging the horse) where she directs her horse to walk, trot, and canter when indicated by the judge. This class is done with all riders in the arena at once whereas the jumping is one rider at a time. Her instructor selected these classes for Em for a variety of reasons, one of which was that there were not as many participants signed up for these classes - 4 - 6 riders depending on the class versus 14-16 riders in the 3 classes prior.
Emma won 2 third place and 1 second place ribbons. Then on the drive home, Brent got a phone call from the instructor that she'd also won "Reserve Champion" which is where all the scores for each rider in the group of classes are averaged and reserve is the second highest average.

now, we are still novices with our camera knowledge - so we're still having picture issues and video issues, but here's what we got. (also, I need to be more aware of lighting!)
here's Emma riding Peachy Keen.

the day was grueling for the parents. Em had to be there at 7am for schooling (practice). I was called and told that if I arrived with the other children around 11 we would be fine. We got there at 11. Em didn't show until 3:15! We're going to have to figure out what to do with this - the babies can't handle 4hrs of not being able to move around freely.
well, she participated in 3 classes - 2 classes jumping 2ft rails and 1 class called undersaddle (judging the horse) where she directs her horse to walk, trot, and canter when indicated by the judge. This class is done with all riders in the arena at once whereas the jumping is one rider at a time. Her instructor selected these classes for Em for a variety of reasons, one of which was that there were not as many participants signed up for these classes - 4 - 6 riders depending on the class versus 14-16 riders in the 3 classes prior.
Emma won 2 third place and 1 second place ribbons. Then on the drive home, Brent got a phone call from the instructor that she'd also won "Reserve Champion" which is where all the scores for each rider in the group of classes are averaged and reserve is the second highest average.
now, we are still novices with our camera knowledge - so we're still having picture issues and video issues, but here's what we got. (also, I need to be more aware of lighting!)
here's Emma riding Peachy Keen.
Friday, September 19, 2008
last night's fortune cookie
"Be prepared for something special." I said, "for the door problem to be fixed." Well, it is being done. After abruptly ending yesterday's post out of teeth-gritting frustration, I called Brent. [an aside here - most of you know how wonderufl he is, but I just can't say enough how he is exactly what I need.] I was so irritated and then felt bad because I'd managed to get him irritated as well and he still had to work. Then I received a txt msg a little while later - from Brent saying he'd talked to Carl. He came home a little while later and we were able to keep that pink elephant in the corner long enough to feed the children and exchange plesantries of the day.
keep reading if you want the long version - the short version was line one above.
I would have called the builder and started beating the dead horse on why he won't bother to call us and why he can't understand that we don't want him making decisions and hasn't he figured out over the last 6 mos that everytime he makes one without talking to us it's been wrong and why continue that...yadda, yadda, yadda. [when I get mad, I dig in my heels and you won't convince me right then that you have the better point --- it's a flaw, I know.] I want nothing short of an admission from the builder that he'd made a mistake -- which he will not give under any circumstance so far - maybe it's our fear of legal repurcusion society. I'm not interested in getting anyone else involved on this project, much less a lawyer!! I just want the man to be honest with himself and then with us.
So you see, me calling him would have only made the situation worse. Brent, the diplomat, called him and explained that we had spent all this time with the supplier and agreed on doors with no hinges/holes and because of those decisions we'd ordered door knobs to match the ones in our house. The knob size will not cover a predrilled hole b/c they are smaller (I don't think predrilled doors were around when our house was built - and our whole purpose is trying to match what we have). Apparently the only response was a long silence. The realization set in that this was indeed a mistake (my take only). The builder said he'd talk to the supplier and that was the end of the conversation.
I combed the internet last night looking for the doors we wanted because I'd been told just a day earlier that they didn't exist. [again, those of you who know me - not a wise choice of words.] Found them.
Brent called this morning about 9 to say Carl had called him early and things were worked out. The supplier took responsibility and agreed to take back the doors. [that still makes me angry because I don't feel it was the supplier's fault - there's someone else here who needs to accept responsibility for his actions. It's been a 3 part error - the builder for making a change without telling us, the supplier for not saying we had agreed on a certain door, and me for not seeing a handwritten note at the bottom of a fax to the builder reading,"with prehung doors."]
The complete and final details are yet to be worked out, but I have faith that we are at least on the right track again.
Now for other news:
I wrote yesterday that no other work could be done without power, but the painters have started priming; they don't need anything but natural light.
I also met with Carl the other day to discuss the openings into our family room. Here was a perfect example of why we chose him - I needed his expert advice in finding out if we could get the finished openings we'd always thought of -- there were some issues with ceiling and wall meetings and the trim , etc. He did some measuring, etc. and gave us a great solution. So, we are back on track with our cased openings into the family room.
A good friend came over the other day and helped me select paint colors. I've never been a fan of painting the whole house white/cream, but until we buy furniture and until the kitchen cabinets are installed, I just can't decide on how the family room and kitchen should look, so they are cream. Then last night I was flipping through a new catalog and saw a neutral sofa with colorful pillows and a brightly painted wall -- I might do that for the family room... I've had fuschia on the brain for the family room (weigh in through the comments or via an email if you have a decorating suggestion.)
I guess that's it. Just didn't want to leave anyone who happened to read the blog last night hanging.
keep reading if you want the long version - the short version was line one above.
I would have called the builder and started beating the dead horse on why he won't bother to call us and why he can't understand that we don't want him making decisions and hasn't he figured out over the last 6 mos that everytime he makes one without talking to us it's been wrong and why continue that...yadda, yadda, yadda. [when I get mad, I dig in my heels and you won't convince me right then that you have the better point --- it's a flaw, I know.] I want nothing short of an admission from the builder that he'd made a mistake -- which he will not give under any circumstance so far - maybe it's our fear of legal repurcusion society. I'm not interested in getting anyone else involved on this project, much less a lawyer!! I just want the man to be honest with himself and then with us.
So you see, me calling him would have only made the situation worse. Brent, the diplomat, called him and explained that we had spent all this time with the supplier and agreed on doors with no hinges/holes and because of those decisions we'd ordered door knobs to match the ones in our house. The knob size will not cover a predrilled hole b/c they are smaller (I don't think predrilled doors were around when our house was built - and our whole purpose is trying to match what we have). Apparently the only response was a long silence. The realization set in that this was indeed a mistake (my take only). The builder said he'd talk to the supplier and that was the end of the conversation.
I combed the internet last night looking for the doors we wanted because I'd been told just a day earlier that they didn't exist. [again, those of you who know me - not a wise choice of words.] Found them.
Brent called this morning about 9 to say Carl had called him early and things were worked out. The supplier took responsibility and agreed to take back the doors. [that still makes me angry because I don't feel it was the supplier's fault - there's someone else here who needs to accept responsibility for his actions. It's been a 3 part error - the builder for making a change without telling us, the supplier for not saying we had agreed on a certain door, and me for not seeing a handwritten note at the bottom of a fax to the builder reading,"with prehung doors."]
The complete and final details are yet to be worked out, but I have faith that we are at least on the right track again.
Now for other news:
I wrote yesterday that no other work could be done without power, but the painters have started priming; they don't need anything but natural light.
I also met with Carl the other day to discuss the openings into our family room. Here was a perfect example of why we chose him - I needed his expert advice in finding out if we could get the finished openings we'd always thought of -- there were some issues with ceiling and wall meetings and the trim , etc. He did some measuring, etc. and gave us a great solution. So, we are back on track with our cased openings into the family room.
A good friend came over the other day and helped me select paint colors. I've never been a fan of painting the whole house white/cream, but until we buy furniture and until the kitchen cabinets are installed, I just can't decide on how the family room and kitchen should look, so they are cream. Then last night I was flipping through a new catalog and saw a neutral sofa with colorful pillows and a brightly painted wall -- I might do that for the family room... I've had fuschia on the brain for the family room (weigh in through the comments or via an email if you have a decorating suggestion.)
I guess that's it. Just didn't want to leave anyone who happened to read the blog last night hanging.
Thursday, September 18, 2008
Ike
Well, it's been an interesting week. First, Ike rolled through town Sunday knocking down trees and powerlines. We didn't loose power at the rental, but did at our house. Luckily we had no damage to our house. But, without power, nothing works. So, the interior trim was delivered, but it can't be installed until we get power. That could be another week... (oh, and school's been out all week too!)
So, I mentioned the delivery of the interior trim. Well, it seems the "talk" had a couple of weeks ago between Brent and the builder (about calling us before making changes himself) didn't stick. Maybe I'm generalizing the conversation too much... We ordered doors with NO holes/hinges. We also made a special order of hinges and door knobs. The builder rebid our trim package with another carpenter - tons cheaper, so that was good (and very nice of him to consider our budget). That carpenter doesn't have whatever is needed to work with doors without hinges/holes. Again, not a seemingly big deal, except that the builder changed our door order without talking to us about it. Now, I'm sure this will all come back to be my fault since it's my job to review the purchase orders and give our approval. I don't routinely read multi-page purchase orders of trim packages containing abbreviations and stock numbers of which I'm unfamiliar. Again, I'm sure it's my fault because I should have called the office to walk me through each and every line before giving my approval, but since we'd spent two days totaling 4+ hours with the trim supplier - at our house, going over every opening, etc., I assumed all those numbers and abbreviations were for the items we'd specifically said we wanted. I'm just so upset that someone who isn't going to live in the house nor pay for the house is the person making the changes. What else can we say besides "we want to make all the decisions" to make our desires of such understood? I'm sure things will get worked out, I'm just tired of finding out things after they've been done - it's a waste of everyone's time and energy and our money.
I'm too frustrated to continue. I'll post later with the other updates.
So, I mentioned the delivery of the interior trim. Well, it seems the "talk" had a couple of weeks ago between Brent and the builder (about calling us before making changes himself) didn't stick. Maybe I'm generalizing the conversation too much... We ordered doors with NO holes/hinges. We also made a special order of hinges and door knobs. The builder rebid our trim package with another carpenter - tons cheaper, so that was good (and very nice of him to consider our budget). That carpenter doesn't have whatever is needed to work with doors without hinges/holes. Again, not a seemingly big deal, except that the builder changed our door order without talking to us about it. Now, I'm sure this will all come back to be my fault since it's my job to review the purchase orders and give our approval. I don't routinely read multi-page purchase orders of trim packages containing abbreviations and stock numbers of which I'm unfamiliar. Again, I'm sure it's my fault because I should have called the office to walk me through each and every line before giving my approval, but since we'd spent two days totaling 4+ hours with the trim supplier - at our house, going over every opening, etc., I assumed all those numbers and abbreviations were for the items we'd specifically said we wanted. I'm just so upset that someone who isn't going to live in the house nor pay for the house is the person making the changes. What else can we say besides "we want to make all the decisions" to make our desires of such understood? I'm sure things will get worked out, I'm just tired of finding out things after they've been done - it's a waste of everyone's time and energy and our money.
I'm too frustrated to continue. I'll post later with the other updates.
Saturday, September 13, 2008
neighbor's perspective
well, it's been a gloomy few days and even though I was dying to get a few pictures, Brent kept saying, "you don't have the right light." We had a small break in the grey, so here are some shots from the front as requested.
right before we moved out
picture from the neighbor before framing in April
neighbor's new perspective
new porch
it's hard to see the house during the spring, summer and fall, but we don't mind! If you can't get a good idea of how it looks, then drive by -- and if you have to drive far (like from another state) we'll put you up for however long you'd like to stay.
Monday, September 8, 2008
porches
Due to a misunderstanding somewhere, a wood door was left "open" to the elements. Once we figured this out, we conversed via email with the architect and he sketched a great little shed type porch overhang for the back all via email (truly amazing his abilities). Well, it's built! The crew is at the house right now framing the new front porch - and me without my camera!
Also, last week I received a call letting me know I could supply the first round light bulbs. I had mentioned early in the process that I didn't want to pay the huge mark up on bulbs from the supplier, so the builder let me go get cheap bulbs. Today, I flipped a switch in the kitchen and Voila - Light! And speaking of light, our solar tube has been installed. This light is awesome. I'd never encountered anything a kin to a skylight this small. They are here in the rental and we have utilized them in rooms without windows like Em's bathroom and our dressing area.
Since it's only Monday, I hope to have more information about what's coming next within a few days. I believe our cabinets, if on schedule, should arrive in 2-4 weeks! Painting is to begin soon. We're still close to square one on tile - awaiting bids. Also awaiting bids on trim carpentry and on concrete for the porches. Garage doors are on order.
Also, last week I received a call letting me know I could supply the first round light bulbs. I had mentioned early in the process that I didn't want to pay the huge mark up on bulbs from the supplier, so the builder let me go get cheap bulbs. Today, I flipped a switch in the kitchen and Voila - Light! And speaking of light, our solar tube has been installed. This light is awesome. I'd never encountered anything a kin to a skylight this small. They are here in the rental and we have utilized them in rooms without windows like Em's bathroom and our dressing area.
Since it's only Monday, I hope to have more information about what's coming next within a few days. I believe our cabinets, if on schedule, should arrive in 2-4 weeks! Painting is to begin soon. We're still close to square one on tile - awaiting bids. Also awaiting bids on trim carpentry and on concrete for the porches. Garage doors are on order.
Tuesday, September 2, 2008
Proud Parents
We are now the proud parents of 4 slabs of white carrera marble. These slabs are for the kitchen only; the bathroom slabs will be 2 cm instead of 3cm and will come from another supplier. Placing these beautiful works of art onto our island is going to be something to witness - the island is 8x8 and therefore needs more than one slab. So making the cuts to get the veins, etc. somewhat lined up is going to be interesting. Who'd a thought all that algebra/geometry would really be useful outside of school! Glad I'm not the one figuring it all out! At least I know the company installing the marble believes in the old addage, "measure twice, cut once," since you don't just go get another slab if you make a mistake. : )
Subscribe to:
Posts (Atom)

