*church and brunch with friends
*VayVay's clothes in closet
*some laundry
*kitchen cabinet hardware installed (what we have at least)
*Em's chandelier hung
*Em's bath cabinet fixed (painters gunked up the holes for the shelf holders)
*helped Em arrange her closet and bathroom - this emptied about 3 more boxes
*separated some boxes in freezing attic and brought some into the house for emptying
*grocery store for milk -- it's snowing -- and a pizza pick-up
*riteaid for poster board for 10 yo homework (at 8:45 pm!)
*measure twice, order once new microwave trim kit
well, we of course did not complete our list, but are pretty pleased with our efforts this weekend. My goal for the end of the week: unpack the boxes I deem necessary. : )
Sunday, January 25, 2009
Saturday, January 24, 2009
accomplished - day 1
*cleaned library
*decided on furniture placement in library (purple for co-effort-heehee) -- room layout only requires the making of one piece of "furniture" that will be another weekend project.
*got desktop up and running, albeit still with modem that is "dropping packets" -- this endeavor involved a trip to attempt a modem exchange at the branch office. Brent was told that a tech will have to come out to exchange the modem. That will be an 8-noon or noon -5 appt that I'll need to be home for...
*master closets cleaned - clothes moved from upstairs closets to their new home. Shoes unboxed and put on shelves. (oh, except for the items that were packed pre-movers - they are still in the frozen attic.)
*VayVay's closet cleaned (no clothes in it yet)
*Em's bathroom floor scrubed with 3 magicerasers, tilex, clorox something and then a little straight bleach. Those size 13 muddy work boots are still winning -- any suggestions on how to get the grout clean? I felt like Richard Gere in An Officer and a Gentleman today scrubbing the bathroom with a toothbrush.
*cabana and master baths cleaned
*vacuumed family room
the hired help is the same color, so don't think I'm super woman.
*picked up Chinese take-out -- something extra! gotta go enjoy some lo mein. We still have tomorrow afternoon to finish...
*decided on furniture placement in library (purple for co-effort-heehee) -- room layout only requires the making of one piece of "furniture" that will be another weekend project.
*got desktop up and running, albeit still with modem that is "dropping packets" -- this endeavor involved a trip to attempt a modem exchange at the branch office. Brent was told that a tech will have to come out to exchange the modem. That will be an 8-noon or noon -5 appt that I'll need to be home for...
*master closets cleaned - clothes moved from upstairs closets to their new home. Shoes unboxed and put on shelves. (oh, except for the items that were packed pre-movers - they are still in the frozen attic.)
*VayVay's closet cleaned (no clothes in it yet)
*Em's bathroom floor scrubed with 3 magicerasers, tilex, clorox something and then a little straight bleach. Those size 13 muddy work boots are still winning -- any suggestions on how to get the grout clean? I felt like Richard Gere in An Officer and a Gentleman today scrubbing the bathroom with a toothbrush.
*cabana and master baths cleaned
*vacuumed family room
the hired help is the same color, so don't think I'm super woman.
*picked up Chinese take-out -- something extra! gotta go enjoy some lo mein. We still have tomorrow afternoon to finish...
THE WEEKEND LIST
As I began thinking about this post, I was reminded of my very own comments on friend, Madmonkmcelroys blog. She shared a weekend fixer-upper type chore list a little while back and when only a few items from her list were actually complete at the end of the weekend, I explained that her list had been too much - as commonly happens when you get a husband/wife team geared up for weekend projects.
Well, Brent's working the short weekend, so I've tried to keep our list manageable and I've also called in paid help (cause you can't get this kind of help for free twice-haha). The list is looking something like this (colored-coded for hers and his):
*set up computer - which first entails deciding on the room layout
*clean the room (known from previous posts as the library -- and no, many books won't fit in it bc of all the windows, but library sounds fancier than office- which just sounds like it going to be a messy room and who wants to think about such a messy room with all those windows for people to see the mess-- I digress.)
*clean the new closets, organize and put all clothes in them
*work on some laundry so those clothes can also go into the new closets
*hang some light fixtures (no sure which ones bc there are quite a few to go up-- but there are even more that need to go up that haven't even been purchased yet)
*begin unloading boxes from the attic in hopes of them thawing
*vacuum family room (this of course isn't just your typical vacuum job - it involves moving mounds of things from "catch all" spots in that room and also several boxes all while trying to not disturb the children who are so wonderfully glued to the tv)
*move cabinet from basement to upstairs (that's 2 floors and requires help)
*revacuum and redust DR, LR, Kitchen, 3 halls, 2 sets of stairs, 4 bedrooms, the playroom and another hall -- apparently the dust will continue to settle for many weeks...
*clean cabinets, organize and put away master bathroom items -- most of which are in the attic
*scrub 3 bathtubs AGAIN (hoping third times a charm -- 3 magic erasers 3 times should do it)
*work on something that doesn't make a big difference during this weekend, but that requires multiple trips to the hardware store (dw panels come to mind)
*complete installation of kitchen cabinet hardware
*clean all built-ins
it looks managable, doesn't it, but hardly anything will be completely finished. : ) I guess the first thing to do is get off the comp and get started...
Well, Brent's working the short weekend, so I've tried to keep our list manageable and I've also called in paid help (cause you can't get this kind of help for free twice-haha). The list is looking something like this (colored-coded for hers and his):
*set up computer - which first entails deciding on the room layout
*clean the room (known from previous posts as the library -- and no, many books won't fit in it bc of all the windows, but library sounds fancier than office- which just sounds like it going to be a messy room and who wants to think about such a messy room with all those windows for people to see the mess-- I digress.)
*clean the new closets, organize and put all clothes in them
*work on some laundry so those clothes can also go into the new closets
*hang some light fixtures (no sure which ones bc there are quite a few to go up-- but there are even more that need to go up that haven't even been purchased yet)
*begin unloading boxes from the attic in hopes of them thawing
*vacuum family room (this of course isn't just your typical vacuum job - it involves moving mounds of things from "catch all" spots in that room and also several boxes all while trying to not disturb the children who are so wonderfully glued to the tv)
*move cabinet from basement to upstairs (that's 2 floors and requires help)
*revacuum and redust DR, LR, Kitchen, 3 halls, 2 sets of stairs, 4 bedrooms, the playroom and another hall -- apparently the dust will continue to settle for many weeks...
*clean cabinets, organize and put away master bathroom items -- most of which are in the attic
*scrub 3 bathtubs AGAIN (hoping third times a charm -- 3 magic erasers 3 times should do it)
*work on something that doesn't make a big difference during this weekend, but that requires multiple trips to the hardware store (dw panels come to mind)
*complete installation of kitchen cabinet hardware
*clean all built-ins
it looks managable, doesn't it, but hardly anything will be completely finished. : ) I guess the first thing to do is get off the comp and get started...
Wednesday, January 21, 2009
update
not much here other than dirt. all of the boxes we moved ourselves almost 2 wks ago are still packed willy-nilly in the attic and are more than likely frozen given the single digit temps this week. Hopefully closets will be finished by Friday so I can actually begin unpacking. Then we'll start the punchlist(s).
another hopeful is that brent will be able to get the main computer up and running this weekend. This ancient laptop is making me crazy -- it "performs illegal operations and must shut down" multiple times a day and VayVay has pulled off a majority of the keys - there is no right side "shift," all the arrow keys have been stuck back on and don't work quite right, the "x" is hinky, and the "a" will now type, but the key doesn't move - it's challenging to post without a full keyboard.
that's it for now. Complaints on lack of pictures should be sent to the hubby. : )
another hopeful is that brent will be able to get the main computer up and running this weekend. This ancient laptop is making me crazy -- it "performs illegal operations and must shut down" multiple times a day and VayVay has pulled off a majority of the keys - there is no right side "shift," all the arrow keys have been stuck back on and don't work quite right, the "x" is hinky, and the "a" will now type, but the key doesn't move - it's challenging to post without a full keyboard.
that's it for now. Complaints on lack of pictures should be sent to the hubby. : )
Thursday, January 15, 2009
surviving
We are surviving. We moved Wednesday in 11 hrs with 2men&atruck which actually turned out to be 6men and 2trucks - guessing we frightened someone with our enormous amount of crap. Anyway, nothing major there.
Have been without cable/phone/comp bc of problems. using laptop from '98 to type this now - same one 2 yo pops all of the keys off of for fun. will try to be short...
house not finished, but we're here.
# of workers who saw me in pjs this morning = 3
# of workers who are now working faster so they don't have to hear the kids screaming all day = all of them. : )
signing off in order to go try out new steam shower.
it's good to be home!
Have been without cable/phone/comp bc of problems. using laptop from '98 to type this now - same one 2 yo pops all of the keys off of for fun. will try to be short...
house not finished, but we're here.
# of workers who saw me in pjs this morning = 3
# of workers who are now working faster so they don't have to hear the kids screaming all day = all of them. : )
signing off in order to go try out new steam shower.
it's good to be home!
Friday, January 9, 2009
more pics
as things are cleaned, I thought I'd add some more pictures before the hiatus.
The master bath vanity, shower and "rug" pattern on the floor. This space has turned out beautifully. It is everything we wanted save the adorable monogrammed frameless, beveled mirrors that I found out today have been discontinued.
Ah! and the basment has been returned to its previous state of usefulness for only $700 + builder's fee. (don't even get me started on that one!)
the new and improved front porch!
the new and improved kitchen!
The master bath vanity, shower and "rug" pattern on the floor. This space has turned out beautifully. It is everything we wanted save the adorable monogrammed frameless, beveled mirrors that I found out today have been discontinued.
is it apparent how much we like this particular piece? It's in almost every post.
Wednesday, January 7, 2009
one last story
Hopefully this will be the last such story of this project. I have to tell it bc it's the perfect example of a woman's view to construction.
So, last week I needed to make an "emergency" run to the house to answer a question about the light switch in the island. Great idea to have it so conveniently located, but apparently not so much in the execution. Mind you all the wiring was completed months ago - if we wanted to keep the island lights per the plan, then we couldn't put in the dimmer. Much hashing of where to move the switch bw builder and electrician resulting in a call to me to come make the final selection. One ph call to Brent and, Viola, problem solved - skip the dimmer -keep switch per plan. But during the explanation phase of why the switch wouldn't work in the designated spot and how moving it to a wall wasn't really viable since this guy didn't know where the "hot" wire originated, the other electrician continued to drill holes into my cabinets. I had to interrupt my conversation with head-electrician (who was a stand-in for the one who actaully wired the house) to ask helper electrician to please stop making holes in my cabinetry until the issue of placement for this switch was finalized. The word "moron" comes to mind.
So then, since I was there, I thought it would be a good idea to give the electrician a mark for the fixture in the bathroom. Well, he'd just finished it. I calmly talked to him about it's placement and why he put it where he did. The explanation went as follows: people use plate mirrors in these spots (well, we already own the mirror that goes there), it should be 30" or so (ours is 24"), and they use a standard for hanging fixtures over sinks. The standard depends a little on who is installing the fixture (so my initial thought is, there isn't really much of a "standard" then if the placement is subjected to the installer), but is usually bw 36-40" over the sink. At this point Mr Electrician pulls out his tape to demonstrate to me, silly woman wasting his time, the height at which he mounted this fixture. Low and Behold!!! it's actually 46" from the sink. Some standard! Of course I had him move it so that now the painting crew will have more unnecessary patching and sanding to do which will result in the cleaning of an item that was clean.
This story is just one more example of why I was so silly to think a meeting of all the subs was a good idea in order to eliminate unnecessary problems. Women! We're such over-thinkers. Well, women and my husband - hahaha. He's actually said multiple times during the last month that if he wants anything done right he needs to quit his job and be the contractor.
So, last week I needed to make an "emergency" run to the house to answer a question about the light switch in the island. Great idea to have it so conveniently located, but apparently not so much in the execution. Mind you all the wiring was completed months ago - if we wanted to keep the island lights per the plan, then we couldn't put in the dimmer. Much hashing of where to move the switch bw builder and electrician resulting in a call to me to come make the final selection. One ph call to Brent and, Viola, problem solved - skip the dimmer -keep switch per plan. But during the explanation phase of why the switch wouldn't work in the designated spot and how moving it to a wall wasn't really viable since this guy didn't know where the "hot" wire originated, the other electrician continued to drill holes into my cabinets. I had to interrupt my conversation with head-electrician (who was a stand-in for the one who actaully wired the house) to ask helper electrician to please stop making holes in my cabinetry until the issue of placement for this switch was finalized. The word "moron" comes to mind.
So then, since I was there, I thought it would be a good idea to give the electrician a mark for the fixture in the bathroom. Well, he'd just finished it. I calmly talked to him about it's placement and why he put it where he did. The explanation went as follows: people use plate mirrors in these spots (well, we already own the mirror that goes there), it should be 30" or so (ours is 24"), and they use a standard for hanging fixtures over sinks. The standard depends a little on who is installing the fixture (so my initial thought is, there isn't really much of a "standard" then if the placement is subjected to the installer), but is usually bw 36-40" over the sink. At this point Mr Electrician pulls out his tape to demonstrate to me, silly woman wasting his time, the height at which he mounted this fixture. Low and Behold!!! it's actually 46" from the sink. Some standard! Of course I had him move it so that now the painting crew will have more unnecessary patching and sanding to do which will result in the cleaning of an item that was clean.
This story is just one more example of why I was so silly to think a meeting of all the subs was a good idea in order to eliminate unnecessary problems. Women! We're such over-thinkers. Well, women and my husband - hahaha. He's actually said multiple times during the last month that if he wants anything done right he needs to quit his job and be the contractor.
Subscribe to:
Posts (Atom)
